

Future Expansion of the
Webster County Fairgrounds
THE INDOOR SHOW ARENA NEEDS A FACELIFT
The indoor arena was built in 1973 and is need of a facelift!
Phase 1:
* New Steel and Spray Foam Insulated Walls (In Progress)
* Industrial Insulated Ceilings (Completed)
* Metal Roof Installation with Waterproofing and UV Reflective Properties (Completed)
* Industrial Ceiling Fans Over Bleachers and Arena (Completed)
* Electrical Upgrades (In Progress)
* All New Doors and Windows (Completed)
​
Phase 2:
* Updated Kitchens and Bathrooms (Summer 2024)



Projects We've Recently Completed
-
Complete remodel of the kitchen & lunchroom, new bar and new LED lighting and ceiling in the auditorium
-
New roof on horse barn
-
New outdoor arena and turn out pens
-
New concrete flooring in the sheep barn and picnic shelter
-
Moved the track and grandstand with new, lighting, pit shack, beer barn and fencing to provide more parking and growth for the fair
-
Added 26 more camping spots and upgraded others
-
New cabin for rental
-
New siding, safer overhead doors, windows, spray form, industrial fans, and lighting in the indoor arena
-
Several new chairs, tables, benches, and picnic tables around the grounds
Projects To Do in the Next 5-10 Years
-
Upgrade the kitchen, bathrooms and electrical in the indoor arena
-
Permanent free stage set for fair and hosting other events
-
Get spray form, new wall siding and watering system installed in the indoor arena
-
Upgrade older camping spots
-
New service tractor to maintain the grounds
-
New roof and siding on the auditorium
-
New Learning Center for agriculture learning during fair
-
Replace the current swine and rabbit barns with a new facility and connect the facility to the indoor arena
-
New structure to replace the poultry barn that is large enough for both poultry and rabbit